In the Shenzhen Dushimingyuan project, the floor slabs were divided into seven trapezoidal panels, and unbonded prestressing technology was adopted at locations with large spans, which better satisfied the requirements of both design and construction.
Reference
Related
Cited by
引用本文
Liu Hailiang Unbonded Prestressed Engineering of Shenzhen Dushimingyuan. Prestress Technology 2002,6(S01):38-40. 10.59238/j. pt. HVM2002.01.010