Overall Design of a Double-Deck Truss Single-Pylon Cable-Stayed Bridge
Author:
Affiliation:

Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai 200092, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The main bridge in Lu’an is a double-deck truss single-pylon cable-stayed bridge with double-cable planes, featuring a span arrangement of 98 m + 105 m + 255 m + 300 m = 758 m. The structural system is a semifloating system with longitudinal restraints. The main girder is a composite steel truss structure comprising two transverse main trusses spaced at 26.1 m. The main trusses adopt a triangular (Warren) configuration, with a truss height of 10 m and a panel length of 15 m. The upper deck consists of an orthotropic steel deck, while the lower deck comprises an orthotropic composite deck. The pylon is designed as a water-drop-shaped tower with a total height of 164.670 m. A total of 32 pairs of stay cables is arranged in a spatial double-cable-plane fan configuration using steel strands with a standard tensile strength of 1,860 MPa. The basic cable spacing is 15.0 m along the deck and 2.5 m along the pylon. The stay cables are anchored at the girder ends using steel anchor boxes, while a combined anchorage system consisting of steel anchor beams and circumferential prestressing (directly anchored into the pylon walls) is employed at the pylon ends.

    Reference
    Related
    Cited by
引用本文

Chengyuan Cao Overall Design of a Double-Deck Truss Single-Pylon Cable-Stayed Bridge. Prestress Technology 2026,4(03):74-86. 10.59238/j. pt.20260526001

复制
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 26,2026
  • Revised:July 07,2026
  • Adopted:July 07,2026
  • Online: September 30,2026
  • Published: