坦桑尼亚姆万扎市近基贡戈/布西西渡轮附近的 J.P. Magufuli 矮塔斜拉桥(3.0公里)建设
作者:
作者单位:

(坦桑尼亚国家公路局,坦桑尼亚 达累斯萨拉姆市 11364)

作者简介:

Katelula Salum Kaswaga, M.E., Professional Civil Engineer PE. Graduated from Beijing Jiaotong University in 2019, China. Working at TANROADS. Research Direction: Bridge Engineering Design and Construction (Cable-Stayed Bridge Expert).

通讯作者:

Katelula Salum Kaswaga

中图分类号:

基金项目:


Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry
Author:
Affiliation:

(Tanzania National Roads Agency, P.O. Box 11364 Dar es Salaam Tanzania)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    J.P. Magufuli 矮塔斜拉桥目前正在建设中。该桥横跨维多利亚湖,全长3000m,桥面宽28.45m,包含:四条3.5m宽机动车道;两侧2.5m+2.5m紧急停车带;两侧2.5m+2.5m人行道;中央2.45m分隔带。主桥采用100m+160m+160m+100m=520m的矮塔斜拉结构,引桥为预应力混凝土(PSC)梁桥,长2480米(两侧引桥均为31×40m=1240m布置)。主桥上部结构为矮塔斜拉桥,采用钢筋混凝土(RCC)桥面板,配有三座高18.856m的钢筋混凝土桥塔。中跨主梁高度5.4m,边跨主梁高度3.2m。本文重点阐述J.P. Magufuli大桥的施工技术,包括实现悬臂平衡施工的特制挂篮系统、桥塔建设、承台预应力施工区建造,以及叠合板组合梁桥面板施工工艺。

    Abstract:

    The J.P. Magufuli extradosed bridge is currently under construction. This bridge crossing Lake Victoria has an overall length of 3,000 m and a deck width of 28.45 m to accommodate 4 lanes of 3.5 m wide carriageways of vehicular traffic, a shoulder of 2.5 m+2.5 m for emergency parking and vehicle breakdown on each side, a 2.5 m+2.5 m footpath for pedestrians on each side, and a median of 2.45 m. The structural arrangement of the main bridge is 100 m+160 m + 160 m+100 m = 520 m, and the approach bridge prestressed concrete (PSC) beam bridge L = 2,480 m (including 31@40=1,240 m on each side). The superstructure is an extradosed bridge with an RCC deck with three RCC pylons 18.856 m in height. The girder heights at the mid-span and end-span are 5.4 m and 3.2 m, respectively. This paper discusses the construction aspects of the J.P. Magufuli bridge along with the details of a special traveling formwork (Form-Traveller) that is used to enable balanced cantilever construction, Pylons, PC House construction for the Pile Cap, and Deck Slab Partial Depth Panel for Deck Slab Construction.

    参考文献
    相似文献
    引证文献
引用本文

Katelula Salum Kaswaga Construction of J. P. Magufuli Extradosed Cable-Stayed Bridge (3.0 km) at Mwanza, Tanzania, near Kigongo / Busisi Ferry. Prestress Technology 2025,3(02):54-68. 10.59238/j. pt.2025.02.005

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-12-13
  • 最后修改日期:2025-06-23
  • 录用日期:
  • 在线发布日期: 2025-06-28
  • 出版日期: 2025-06-28