    摘要:

    由于斜拉桥结构较为复杂,为了使桥梁实际施工状态接近于理想状态,桥梁在施工建设过程中必须进行严格的监测与控制。本文以浙江省金华市金婺大桥为研究背景,该桥为非对称独塔斜拉桥,桥塔两侧主梁跨径及材料不同,在斜拉索张拉过程中,主梁空间效应显著且易产生不平衡力矩。对斜拉索张拉方案开展研究。研究结果显示,相比于斜拉索一次张拉方案,采用二次张拉方案时,桥梁的应力状态、索力等指标较好,满足施工监控要求。

    Abstract:

    Due to the complex structure of cable-stayed bridges, strict monitoring and control must be carried out during the construction process in order to make the actual construction state of the bridge close to the ideal state. This article takes the Jinwu Bridge in Jinhua City, Zhejiang Province as the research background. The bridge is an asymmetric single tower cable-stayed bridge, and the main beams on both sides of the tower have different spans and materials. During the tensioning process of the cable-stayed cables, the spatial effect of the main beams is significant and unbalanced moments are easily generated. Conduct research on tensioning schemes for cable-stayed cables. The research results show that compared to the one-time tensioning scheme of cable-stayed cables, the stress state and cable tension of the bridge are better when using the secondary tensioning scheme, which meets the requirements of construction monitoring.

    参考文献
    相似文献
    引证文献
引用本文

Zhangquan, Li Xianjing, Wu Jishu, Liuchao Study on cable-stayed cable tensioning scheme in construction monitoring of asymmetric single-tower cable-stayed bridge. Prestress Technology 2023,1(3). [doi]

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2023-12-24
  • 最后修改日期:2023-12-29
  • 录用日期:2023-12-31
  • 在线发布日期: 2024-01-17
  • 出版日期: