+高级检索 English
大跨组合梁斜拉桥装配化安装关键技术研究
作者:
作者单位:

(四川省公路规划勘察设计研究院有限公司, 成都 610041)

作者简介:

Bo Tian, Ph.D, Professor Sen-ior Engineer. Work at Sichuan Highway Planning, Survey, Design and Research Institute Ltd. Chengdu, Sichuan, Chi-na.

通讯作者:

Bo Tian

中图分类号:

基金项目:


Study on Key Technology of Assembling Installation of Long-Span Composite Girder Cable-Stayed Bridge
Author:
Affiliation:

(Sichuan Highway Planning, Survey, Design and Research Institute Ltd. , Chengdu 610041, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    宜宾南溪(仙源)长江大桥采用主跨572m双塔双索面组合梁斜拉桥,上部结构采用装配化的架设方法。为保证组合梁的钢主梁与桥面板安装控制内力、安装精度并兼顾组合梁施工效率,通过建立全桥及分段有限元计算模型,结合现场监控数据对比研究,提出了基于节段全过程内力状态和几何状态优化的上部结构安装架设控制方法。在合理控制了组合梁安装应力和安装精度基础上,通过对钢主梁与混凝土桥面板湿接缝浇筑工序和斜拉索张拉工序的优化,提高了施工效率。并将等值张拉法运用于斜拉索张拉工序,从而保证了钢绞线索力的均匀性。相关结论适用于同类型组合梁斜拉桥架设施工。

    Abstract:

    The Nanxi (Xianyuan) Yangtze River Bridge in Yibin is a composite beam cable-stayed bridge with twin towers and double cable planes and a main span of 572 m. The superstructure is erected by the assembly method. In order to ensure the precise installation and control of internal forces for steel girders and bridge deck slabs of composite beams while also considering the construction efficiency of composite beams, a control method for the installation and erection of the superstructure has been proposed. This method is based on optimizing the internal force and geometric states of segments throughout the entire process, achieved by establishing finite element calculation models for both the full bridge and segmented sections and combining these with comparative studies of on-site monitoring data. With the installation stress and precision of composite beams properly controlled, construction efficiency has been enhanced through the optimization of the pouring process for wet joints between steel girders and concrete bridge deck slabs, as well as the tensioning process for stay cables. The equivalent tension method is applied to the tension process of the stay cable, thus ensuring the uniformity of the cable force of the steel strand. The relevant conclusions are applicable to the same type of composite girder cable-stayed bridge erection construction.

    参考文献
    相似文献
    引证文献
引用本文

Bo Tian, Ting Zhou, Kai Wen Study on Key Technology of Assembling Installation of Long-Span Composite Girder Cable-Stayed Bridge. Prestress Technology 2023,1(01):81-88. 10.59238/j. pt.2023.01.007