(1.中铁十八局集团第二工程有限公司, 河北唐山 063000;2.广西大学土木建筑工程学院, 广西南宁 530004)
王维新
TU473.1
(1.China Railway 18th Bureau Group No.2 Engineering Co.,Ltd., Tangshan 063000;2.School of Civil and Architectural Engineering,Guangxi University, Nanning 530004)
Weixin Wang, Nianchun Deng, Yu xia, Yong Li, Dawei Jiang, Xiuning Peng Application of simplified double sleeve valve pipe grouting method in the foundation pit construction of Liangqing Bridge. Prestress Technology 2017,21(04):7-11. 10.59238/j. pt.2017.04.002
复制