+高级检索 English
斜拉索安装过程牵引力控制分析研究
作者:
作者单位:

(柳州欧维姆工程有限公司,广西柳州 545005)

作者简介:

张国强

通讯作者:

中图分类号:

U448.27

基金项目:


Analysis and research on traction control during the installation process of stay cables
Author:
Affiliation:

(Liuzhou OVM Engineering Co., Ltd.,Liuzhou 545005,china)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    斜拉索安装是大跨度斜拉桥施工的重要环节,以临海高等级公路灌河大桥斜拉索施工安装为例,通过分析灌河大桥斜拉索施工在不同牵引力控制情况,得出更为优化的挂索方案,该方案可以降低斜拉索梁端锚固安装难度,提高斜拉索施工的安装效率,确保了安全、优质、高效的施工质量

    Abstract:

    The installation of stay cables is an important part of the construction of large-span cable-stayed bridges. Taking the construction and installation of stay cables for the Guanhe Bridge on a high-grade highway near the sea as an example, by analyzing the different traction control conditions of the Guanhe Bridge's stay cable construction, a more optimized suspension plan is obtained. This plan can reduce the difficulty of anchoring and installing the stay cable at the beam end, improve the installation efficiency of the stay cable construction, and ensure safe, high-quality, and efficient construction quality

    参考文献
    相似文献
    引证文献
引用本文

Zhang Guoqiang, Zou Shicheng Analysis and research on traction control during the installation process of stay cables. Prestress Technology 2016,20(05):31-35. 10.59238/j. pt.2016.05.007

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-08
  • 出版日期: