悬索桥施工用塔顶门架的优化设计方案
作者:
作者单位:

(柳州欧维姆机械股份有限公司,柳州 545005)

作者简介:

余丹

通讯作者:

中图分类号:

TU723.3

基金项目:


Optimal design scheme of tower top gantry for suspension bridge construction
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在悬索桥缆索系统施工中,塔顶门架作为最重要的临时设施之一,对塔顶门架进行优化设计从成本控制方面考虑是非常必要的。文中以贵港市同济大桥为背景进行研究,以技术上成熟、经济上合理为原则,通过改变门架的连接方式、优化柱脚处理等方式,提高门架的利用率,减小损耗率,节约施工成本。

    Abstract:

    As one of the most important temporary facilities in the construction of suspension bridge cable system, it is very necessary to optimize the design of tower top gantry from the perspective of cost control. In this paper, the background of Tongji Bridge in Guigang City is studied. Based on the principle of technically mature and economically reasonable, the utilization rate of gantry is improved, the loss rate is reduced and the construction cost is saved by changing the connection mode of gantry and optimizing the treatment of column feet.

    参考文献
    相似文献
    引证文献
引用本文

Dan Yu, Futang Wei, Ke Gan, Mian Luo Optimal design scheme of tower top gantry for suspension bridge construction. Prestress Technology 2016,20(01):28-32. 10.59238/j. pt.2016.01.005

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-06
  • 出版日期: