资阳沱江三桥系杆更换施工技术
作者:
作者单位:

(柳州欧维姆机械股份有限公司,柳州 545005)

作者简介:

廖德鸿

通讯作者:

中图分类号:

TU753.3

基金项目:


Construction technology of tie rod replacement for Ziyang Tuojiang Third Bridge
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    中承式拱桥目前作为城市的景观桥梁较为普遍,本文以资阳沱江三桥为例,重点介绍上游N1#、下游N2#系杆逐步放张至拆除的施工工艺,其余系杆的补张进行配合,以及安装上游N1#、下游N2#系杆的施工工艺。就这些工艺在施工中出现的一些问题进行探讨。

    Abstract:

    At present, the middle arch bridge is a common urban landscape bridge. Taking Ziyang Tuojiang Bridge as an example, this paper focuses on the construction technology of gradually tensioning and dismantling of the upstream N1# and downstream N2# tie rods, and the construction technology of installing the upstream N1# and downstream N2# tie rods. Some problems in the construction of these processes are discussed.

    参考文献
    相似文献
    引证文献
引用本文

Dehong Liao, Jianrong Tang, Yanqiao Huang Construction technology of tie rod replacement for Ziyang Tuojiang Third Bridge. Prestress Technology 2015,19(01):29-32. 10.59238/j. pt.2015.01.007

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-06
  • 出版日期: