(柳州欧维姆工程有限公司 柳州 545005)
曾俊志
TU753.3
(Liuzhou Overwem Engineering Co., LTD. Liuzhou 545005)
Junzhi Zeng, Futang Wei, Shitao Zhu A brief discussion on the construction technology of replacing hollow slab beam support by synchronous jacking with bullleg method. Prestress Technology 2014,18(04):33-36. 10.59238/j. pt.2014.04.007
复制