+高级检索 English
港珠澳大桥CB04标预制件移运方案研究
作者:
作者单位:

(柳州欧维姆机械股份有限公司,柳州 545005)

作者简介:

韦富伦

通讯作者:

中图分类号:

TV642.2

基金项目:


Study on the transportation scheme of Hong Kong-Zhuhai-Macao Bridge CB04 standard prefabricated parts
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    目前国内港口桥梁预制场预制件趋于整体预制的大趋势,预制件呈现超大、超高、超重等多元化的特点,这对预制件的移运提出了更高的要求。针对港珠澳大桥CB04标预制件承台结构特点,对该工程运输方案做进一步研究。

    Abstract:

    At present, the prefabricated parts tend to be the whole prefabricated parts in domestic port bridge prefabrication yard, and the prefabricated parts show diversified characteristics such as oversized, ultra-high and overweight, which puts forward higher requirements for the transportation of prefabricated parts. According to the structural characteristics of the prefabricated cap of Hong Kong-Zhuhai-Macao Bridge CB04 standard, the transportation scheme of the project is further studied.

    参考文献
    相似文献
    引证文献
引用本文

Fulun Wei, Xiaoyan Zhang, Li Chen, Hangyu Zeng, Jun Liu Study on the transportation scheme of Hong Kong-Zhuhai-Macao Bridge CB04 standard prefabricated parts. Prestress Technology 2013,17(03):36-38. 10.59238/j. pt.2013.03.007

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-06
  • 出版日期: