南阁大桥临时索锚箱设计及斜拉索更换施工
作者:
作者单位:

(柳州欧维姆工程有限公司,广西柳州 545005)

作者简介:

孙剑飞

通讯作者:

中图分类号:

U448.27

基金项目:


Design of Temporary Cable Anchor Box and Replacement Construction of Stay Cable for Nange Bridge
Author:
Affiliation:

(Liuzhou OVM Engineering Co., Ltd.,Liuzhou 545005,china)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    南阁大桥为钢筋混凝土装配式斜拉桥,斜拉索更换过程中采用临时索支承体系辅助斜拉索更换施工,由于主桥结构特殊,临时索与主桥结构联接采用摩擦传递力的原理而设计的摩擦型锚箱,锚箱系统采用全焊结构的箍抱结构形式,斜拉索更换时采用分级多次体系转换完成,要求高程和位移基本不变的原则进行控制

    Abstract:

    The Nange Bridge is a reinforced concrete prefabricated cable-stayed bridge. During the process of replacing the stay cables, a temporary cable support system is used to assist in the replacement construction of the stay cables. Due to the special structure of the main bridge, the temporary cables are connected to the main bridge structure using the principle of friction transmission force, and the friction type anchor box is designed. The anchor box system adopts a fully welded structure in the form of a hoop structure. During the replacement of the stay cables, a graded and multiple system transformations are used, Control based on the principle of basic invariance of elevation and displacement

    参考文献
    相似文献
    引证文献
引用本文

Sun Jianfei, Wei Futang, Tan Jundong Design of Temporary Cable Anchor Box and Replacement Construction of Stay Cable for Nange Bridge. Prestress Technology 2010,14(04):33-35. 10.59238/j. pt.2010.04.009

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-08
  • 出版日期: