Construction Technology of Stay Cables for Sanmenjiang Bridge in Liuzhou
Author:
Affiliation:

(China TIESIJU Civil Engineering Group Co., Ltd.,Hefei 230023)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    柳州三门江大桥主桥为双塔、双索面、三跨部分斜拉预应力混凝土箱梁桥。介绍了主桥斜拉索的体系构造、总体施工方案、施工方法、索力监控方法、施工工艺及施工要点等,对斜拉索施工中的注意事项进行了较详细的闸述。

    Abstract:

    The main bridge of Sanmenjiang River Bridge in Liuzhou is a prestressed concrete Box girder bridge bridge with double towers, double cable planes and three spans. This article introduces the system structure, overall construction plan, construction method, cable force monitoring method, construction technology, and construction points of the main bridge cable-stayed cable, and provides a detailed description of the precautions during the construction of the cable-stayed cable.

    参考文献
    相似文献
    引证文献
引用本文

Hu Yong Construction Technology of Stay Cables for Sanmenjiang Bridge in Liuzhou. Prestress Technology 2009,13(02):20-22. 10.59238/j. pt.2009.02.004

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-10
  • 出版日期: