    摘要:

    施工控制的核心任务就是对各种误差进行分析、识别、调整,对结构未来状态作出预测。 连续梁桥、连续T构和噼句带挂孔形式桥,没有像斜拉桥斜拉索那样容易调整,只能靠立模标高和预应力束来调整,故要保证控制目标的实现

    Abstract:

    The core task of construction control is to analyze, identify, adjust various errors, and predict the future state of the structure. Continuous beam bridges, continuous T-structures, and cable-stayed bridges with hanging holes are not as easy to adjust as cable-stayed bridges, and can only be adjusted by formwork elevation and prestressed tendons. Therefore, it is necessary to ensure the achievement of control objectives

    参考文献
    相似文献
    引证文献
引用本文

Qiu Shizhong Bridge Construction Control Technology (2). Prestress Technology 2009,13(01):28-34. 10.59238/j. pt.2009.01.007

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-10
  • 出版日期: