Based on practical experience, this article summarizes the quality problems that are prone to occur during the construction of concrete bored piles, and proposes measures for pre control during the supervision process.
参考文献
相似文献
引证文献
引用本文
Zhao Jiqiang Discussion on Quality Pre control of Concrete Bored Pile Supervision. Prestress Technology 2008,12(03):38-39. 10.59238/j. pt.2008.03.010