    摘要:

    该文介绍了南太湖大桥的斜拉索的索力调整的优化施工。通过对斜拉桥施工过程中各阶段、不同的工况下斜拉索索力和成桥恒载时的最终索力进行优化,保证了结构受力合理和施工安全,使成桥后结构受力及全桥线型都较为合理。

    Abstract:

    The paper introduces the optimized construction of cable-stayed cable adjustment of South Taihu Lake Bridge. Through the optimization of the cable-stayed bridge construction process at various stages and under different working conditions, the cable-stayed cable force and the final cable force at the time of constant load of the bridge are optimized to ensure the reasonable structural stress and construction safety, so that the structural stress after the bridge is completed and the whole bridge line is more reasonable.

    参考文献
    相似文献
    引证文献
引用本文

Shen Fei, Li Zhaoliang Cable force optimization construction of stay cables of South Taihu Bridge. Prestress Technology 2006,10(04):29-31. 10.59238/j. pt.2006.04.007

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-10
  • 出版日期: