(1.天津大学建工学院;2.黄委会勘测设计研究院;3.小浪底建管局;)
亢景付
TU473.13
(1.College of Construction and Engineering, Tianjin University;2. Huang Wei Survey and Design Research Institute;3. Xiaolangdi Construction Management Bureau;)
Kang Jingfu, Hu Yuming, Hou Xinhua Actual measurement and analysis of prestressed changes in the concrete lining of Xiaolangdi sand discharge tunnel at different stages. Prestress Technology 2006,10(02):10-15. 10.59238/j. pt.2006.02.002
复制