    1.问题的提出。挂篮悬臂浇注、挂篮悬臂拼装时,挂篮要负担整个梁段重量,挂篮本身重量就很可观了,而挂篮重量由已浇箱梁束承受。这就加大了施工时梁的内力,怎样减少施工时梁的内力,使之尽量与运营时梁的内力要求趋于一致,这是设计与施工共同思索的问题之一,采用挂篮施工由于受到节段混凝土重量限制,每节段的长度一般在3~4米左右,每个节段的施工周期,平均也要7~10天左右,这样总的施工期相对就缓长,特别是当把挂篮用于大跨径斜拉桥的施工时,不仅施工周期次数多,而且由于挂篮重量较大,每一节段拉索的内力均在施工阶段进行控制,增大了钢束用量,另外,索力还要反复调整,给设计和施工带来很多不便。

    Abstract:

    1. The raising of the question. When hanging basket cantilever casting, hanging basket cantilever assembly, hanging basket to bear the weight of the entire beam segment, hanging basket itself weight is very considerable, and hanging basket weight by the poured box beam beam to bear. This increases the internal force of the beam during construction, how to reduce the internal force of the beam during construction, so as to make it as consistent as possible with the internal force requirements of the beam during operation, which is one of the problems of design and construction, the use of hanging basket construction due to the weight limit of concrete segments, the length of each segment is generally about 3 to 4 meters, and the construction period of each segment is about 7 to 10 days on average. In this way, the total construction period is relatively slow and long, especially when the hanging basket is used in the construction of long-span cable-stayed bridge, not only the construction period is more, but also because the weight of the hanging basket is large, the internal force of each section of the cable is controlled in the construction stage, increasing the amount of steel bundle, in addition, the cable force must be adjusted repeatedly, which brings a lot of inconvenience to the design and construction.

    参考文献
    相似文献
    引证文献
引用本文

Shizhong Qiu Hanging basket and cantilever mixed construction technology. Prestress Technology 2005,9(02):22-26. 10.59238/j. pt.2005.02.005

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: