+高级检索 English
预应力砼结构施工阶段内力定量分析
作者:
作者单位:

(柳州欧维姆机械股份有限公司,柳州 545005)

作者简介:

唐建荣

通讯作者:

中图分类号:

TU528;TU378

基金项目:


Quantitative analysis of internal force of prestressed concrete structure during construction
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    本文结合浙江海盐塘桥横梁预应力施工,提出体内预应力砼构件在施工阶段内力量化的重要性,避免构件或结构因为施工阶段的内力量化不够而遭遇破坏。

    Abstract:

    In this paper, based on the prestressed construction of the beam of Haiyantang Bridge in Zhejiang Province, the importance of quantifying the internal force of the internal prestressed concrete member in the construction stage is proposed to avoid the failure of the member or structure due to insufficient quantification of internal force in the construction stage.

    参考文献
    相似文献
    引证文献
引用本文

Jianrong Tang, Dongping Li Quantitative analysis of internal force of prestressed concrete structure during construction. Prestress Technology 2005,9(01):32-34. 10.59238/j. pt.2005.01.006

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: