(柳州欧维姆机械股份有限公司,柳州 545005)
甘科
TU758.13;U448.25
(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)
Ke Gan, Zhuangke Wei, Ganming Zhao, Ting Liang Installation and construction technology of suspension structure of Ziya River Bridge in Tianjin. Prestress Technology 2004,8(04):18-24. 10.59238/j. pt.2004.04.003
复制