The main bridge of Sohae Bridge in South Korea is a three-span superimposed girder cable-stayed bridge with a main span of 470m. LUD devices are installed between the tower beams. For sector double cable plane; The equal tension control method is adopted for steel strand tensioning. The design and construction of Xihai Bridge are introduced.
参考文献
相似文献
引证文献
引用本文
Fengqun Li, Zhao Liu South Korea West Sea bridge design. Prestress Technology 2004,8(02):26-29. 10.59238/j. pt.2004.02.006