+高级检索 English
湖北蒲圻2×300MW电厂锅炉汽包吊装施工
作者:
作者单位:

(柳州欧维姆机械股份有限公司,柳州 545005)

作者简介:

秦立方

通讯作者:

中图分类号:

TU761.2

基金项目:


Hubei Puqi 2×300MW power plant boiler drum hoisting construction
Author:
Affiliation:

(Liuzhou OVM Machinery Co., Ltd., Liuzhou 545005,China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    湖北蒲圻电厂2×300MW机组,汽包外形直径φ2.033m,长22.500m,重167t,提升过程中汽包需倾斜32°以上,方可顺利通过各层横梁。本文通过分析吊装过程中汽包的受力状态,论述了液压提升技术在汽包倾斜吊装中的可行性,对汽包吊装具有普遍意义。

    Abstract:

    The 2×300MW unit of Hubei Puqi Power Plant has a drum diameter of 2.033m, a length of 22.500m and a weight of 167t. During the lifting process, the drum needs to tilt more than 32° before it can pass through the beams of each layer smoothly. This paper discusses the feasibility of hydraulic lifting technology in inclined lifting of drum by analyzing the stress state of drum during lifting, which has universal significance for drum lifting.

    参考文献
    相似文献
    引证文献
引用本文

Lifang Qin, Zhenliang Wei, Shaohui Lu, Ke Yang Hubei Puqi 2×300MW power plant boiler drum hoisting construction. Prestress Technology 2004,8(01):21-23. 10.59238/j. pt.2004.01.005

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: