+高级检索 English
苏嘉杭高速公路苏州高架桥现浇箱梁施工控制
作者:
作者单位:

(苏嘉杭高速公路建设指挥部)

作者简介:

沈惠荣

通讯作者:

中图分类号:

U448.14

基金项目:


Construction control of cast-in-place box girder on Suzhou viaduct of Sujia-Hangzhou Expressway
Author:
Affiliation:

(Sujia-hangzhou expressway construction headquarters)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    现浇箱梁施工在高速公路桥梁建设中广泛采用,苏嘉杭高速公路苏州高架桥现浇箱梁施工中对施工技术要求提出了更高的标准,以确保达到"线形美观,衔接平滑"的质量要求。

    Abstract:

    Cast-in-place box girder construction is widely used in highway bridge construction, and higher standards are put forward in the construction of cast-in-place box girder construction of Suzhou viaduct highway to ensure that the quality requirements of "beautiful line shape and smooth connection" are achieved.

    参考文献
    相似文献
    引证文献
引用本文

Huirong Shen Construction control of cast-in-place box girder on Suzhou viaduct of Sujia-Hangzhou Expressway. Prestress Technology 2003,7(01):10-14. 10.59238/j. pt.2003.01.002

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: