+高级检索 English
P、C 斜拉桥基本结构型式的简要归纳与分析
作者:
作者单位:

(上海市基础工程公司)

作者简介:

邱式中

通讯作者:

中图分类号:

U448.27

基金项目:


Brief induction and analysis of basic structure types of P and C cable-stayed Bridges
Author:
Affiliation:

(Shanghai Foundation Engineering Company)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    P、C 斜拉桥是由下部结构连同梁、塔、索三要素组成,从一个或多个塔柱上伸出的钢索,沿桥跨的许多点来支承上部结构的桥型。整个体系影响因素众多,按照王伯惠等人对主跨330米的大洋河桥研究提出了1.影响斜拉桥结构各部受力的最根本因素是梁、塔、墩之间的结合方式;2.

    Abstract:

    P and C cable-stayed Bridges are composed of three elements of the substructure, beams, towers and cables, and steel cables extending from one or more tower columns along many points of the bridge span to support the upper structure. There are many influencing factors in the whole system. According to Wang Bohui et al. 's study on the ocean river bridge with a main span of 330 meters, 1. The most fundamental factor affecting the force of each part of the cable-stayed bridge structure is the combination of beam, tower and pier. 2.

    参考文献
    相似文献
    引证文献
引用本文

Shizhong Qiu Brief induction and analysis of basic structure types of P and C cable-stayed Bridges. Prestress Technology 2003,7(01):3-9. 10.59238/j. pt.2003.01.001

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: