+高级检索 English
漳州战备大桥斜拉索的施工监理
作者:
作者单位:

(福建省交通建设工程监理咨询公司)

作者简介:

齐云惠

通讯作者:

中图分类号:

U448.27

基金项目:


Construction Supervision of the Stay Cable of Zhangzhou War Preparedness Bridge
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    漳州战备大桥主桥为单索面三跨预应力混凝土部分斜拉桥,该桥的斜拉索结构的受力与普通的斜拉索有着本质的区别。本文介绍了该体外预应力式斜拉索的施工监理过程及控制要点。

    Abstract:

    The main bridge of Zhangzhou War Preparation Bridge is a single cable-stayed three-span prestressed concrete partial cable-stayed bridge, and the force of the cable-stayed structure of the bridge is fundamentally different from that of ordinary cable-stayed cables. This paper introduces the construction supervision process and control points of the extracorporeal prestressed cable-stayed cable-stayed bridge.

    参考文献
    相似文献
    引证文献
引用本文

Qi Yunhui, Lin Xiu Construction Supervision of the Stay Cable of Zhangzhou War Preparedness Bridge. Prestress Technology 2002,6(03):20-22. 10.59238/j. pt.2002.03.006

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-10
  • 出版日期: