The main bridge of Zhangzhou War Preparation Bridge is a (80.8+132.0+80.8)m double-tower single cable-stayed three-span continuous partially cable-stayed prestressed concrete box girder bridge, which introduces the arrangement of the cable-stayed cables of the main bridge, the system structure and the force.
参考文献
相似文献
引证文献
引用本文
Wang Kai, Zheng Hongyang, Li Min Design of Stay Cables for the Main Bridge of Zhangzhou War Preparedness Bridge. Prestress Technology 2002,6(03):6-8. 10.59238/j. pt.2002.03.002