+高级检索 English
漳州战备大桥主桥斜拉索设计
作者:
作者单位:

(Wang Kai, Zheng Hongyang, Li Min)

作者简介:

王凯

通讯作者:

中图分类号:

U448.27

基金项目:


Design of Stay Cables for the Main Bridge of Zhangzhou War Preparedness Bridge
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    漳州战备大桥主桥为(80.8+132.0+80.8)m双塔单索面三跨连续部分斜拉预应力混凝土箱梁桥,介绍其主桥斜拉索的布置、体系构造以及受力。

    Abstract:

    The main bridge of Zhangzhou War Preparation Bridge is a (80.8+132.0+80.8)m double-tower single cable-stayed three-span continuous partially cable-stayed prestressed concrete box girder bridge, which introduces the arrangement of the cable-stayed cables of the main bridge, the system structure and the force.

    参考文献
    相似文献
    引证文献
引用本文

Wang Kai, Zheng Hongyang, Li Min Design of Stay Cables for the Main Bridge of Zhangzhou War Preparedness Bridge. Prestress Technology 2002,6(03):6-8. 10.59238/j. pt.2002.03.002

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-10
  • 出版日期: