+高级检索 English
顶推梁设计、施工中有关张拉、压浆问题的分析与处理——兼介一种新型钢绞线联接器
作者:
作者单位:

(中铁第十六工程局施技处)

作者简介:

徐化轩

通讯作者:

中图分类号:

U445.462

基金项目:


Analysis and Treatment of Tensioning and Grouting Problems in the Design and Construction of Pushing Beam - Also Introducing a New Type of Steel Strand Connector
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    总结多座顶推梁预应力张拉和压浆的基础上,对有关问题的分析与处理进行了详细介绍。同时介绍了一种新型钢绞线联接器。

    Abstract:

    On the basis of summarizing the prestressing tensioning and grouting of several jacking girders, the analysis and treatment of related problems are described in detail. A new type of strand coupling is also introduced.

    参考文献
    相似文献
    引证文献
引用本文

Xu Huaxuan Analysis and Treatment of Tensioning and Grouting Problems in the Design and Construction of Pushing Beam - Also Introducing a New Type of Steel Strand Connector. Prestress Technology 2002,6(02):6-10. 10.59238/j. pt.2002.02.002

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-10
  • 出版日期: