Construction of prestressed concrete cast-in-situ continuous span box girder of Tanzhong Viaduct in Liuzhou
Author:
Affiliation:
Fund Project:
摘要
|
图/表
|
访问统计
|
参考文献
|
相似文献
|
引证文献
|
资源附件
|
文章评论
摘要:
本文概述了潭中高架桥预应力施工过程,重点介绍了施工工艺和新型预应力张拉设备在施工中的应用。
Abstract:
This paper summarizes the pre-stressing construction process of Tanzhong viaduct, focusing on the construction process and the application of new pre-stressing tensioning equipment in the construction.
参考文献
相似文献
引证文献
引用本文
Feng Mingyuan, Deng Yu, Lin Yichen Construction of prestressed concrete cast-in-situ continuous span box girder of Tanzhong Viaduct in Liuzhou. Prestress Technology 2001,5(06X):16-18. 10.59238/j. pt.2001.06X.005