+高级检索 English
上海磁悬浮铁路轨道梁预应力施工
作者:
作者单位:

(柳州海威姆建筑机械有限公司)

作者简介:

杨武

通讯作者:

中图分类号:

TU757

基金项目:


Prestressed construction of Railway track beam of Shanghai maglev
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    本文介绍了上海磁悬浮铁路轨道梁的预应力施工过程。轨道梁预应力施工分先张和后张法,后张法采用 HVM 锚具,分两次进行张拉,以尽量减少混凝土收缩徐变对轨道梁的影响。同时,介绍了该工程施工中应注意的限位板放置问题。

    Abstract:

    This paper introduces the prestressing construction process of track girders for Shanghai Maglev Railway. The pre-stressing construction of track girders is divided into pre-tensioning and post-tensioning methods, and the post-tensioning method adopts HVM anchorage, which is tensioned in two times, in order to minimize the effect of concrete shrinkage and creep on the track girders. At the same time, the problem of placing the limit plate which should be paid attention to in the construction of this project is introduced.

    参考文献
    相似文献
    引证文献
引用本文

Yang Wu, Zhu Wanxu Prestressed construction of Railway track beam of Shanghai maglev. Prestress Technology 2001,5(06X):14-15. 10.59238/j. pt.2001.06X.004

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-12
  • 出版日期: