(北京四维新建筑科技开发中心)
周华
TU757
本文简要介绍了多伦多 CN 塔在进行预应力施工时所遇到的问题和解决问题的方法。
This paper briefly describes the problems encountered in prestressing the CN Tower in Toronto and how they were solved.
Zhou Hua Prestressed Construction of Toronto Telecommunications Tower. Prestress Technology 2001,5(05X):42-48. 10.59238/j. pt.2001.05X.010