(铁道部大桥工程局第一桥梁工程处)
欧阳克武
U448.215
Ouyang Kewu Prefabricated and assembled PC continuous beam (2). Prestress Technology 2001,5(04):27-38. 10.59238/j. pt.2001.04.007