南京长江二桥北汉桥北引桥50m连续箱梁的设计与施工
作者:
作者单位:

(中交第一公路勘察设计研究院)

作者简介:

冯云成

通讯作者:

中图分类号:

U448.215

基金项目:


Design and Construction of 50m Continuous Box Girders for the North Approach Bridge of Beihan Bridge of Nanjing Yangtze River Second Bridge
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍先进移动模架逐跨浇注施工法在南京长江第二大桥北汊桥北引桥5×50m连续箱梁桥上的应用。自动化程度高,可有效地缩短工期。并讨论采用这种施工方法时预拱度的设置问题,以及与施工相关的设计问题。

    Abstract:

    It introduces the application of the advanced span-by-span casting construction method of mobile molding frame on the 5×50m continuous box girder bridge of the North Approach Bridge of Beicha Bridge of Nanjing Second Yangtze River Bridge. The method is highly automated and can effectively shorten the construction period. It also discusses the setting of pre-arch and the design problems related to the construction of this method.

    参考文献
    相似文献
    引证文献
引用本文

Feng Yuncheng, Wei Guangsheng, Wang Sishun, Liu Shilin Design and Construction of 50m Continuous Box Girders for the North Approach Bridge of Beihan Bridge of Nanjing Yangtze River Second Bridge. Prestress Technology 2000,4(04):21-23. 10.59238/j. pt.2000.04.005

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-11
  • 出版日期: