Production test of post tensioned unbonded prestressed concrete lining for Xiaolangdi sand discharge tunnel
Author:
Affiliation:
Fund Project:
摘要
|
图/表
|
访问统计
|
参考文献
|
相似文献
|
引证文献
|
资源附件
|
文章评论
摘要:
Abstract:
参考文献
相似文献
引证文献
引用本文
Li Haining Production test of post tensioned unbonded prestressed concrete lining for Xiaolangdi sand discharge tunnel. Prestress Technology 1999,3(05):28-30. 10.59238/j. pt.1999.05.011