Hydraulic Lifting Installation Construction of Steel Box Girders for Beijing East Fourth Ring Interchange
Author:
Affiliation:
Fund Project:
摘要
|
图/表
|
访问统计
|
参考文献
|
相似文献
|
引证文献
|
资源附件
|
文章评论
摘要:
本文介绍一种大跨度城市立交桥钢箱梁新的提升安装方法,简述其工艺过程及关键施工技术
Abstract:
This paper introduces a new lifting and installation method for steel box girders of large-span urban overpasses, and briefly describes its process and key construction technologies.
参考文献
相似文献
引证文献
引用本文
Tang Jianguo, Sun Yifeng, Peng Shengji Hydraulic Lifting Installation Construction of Steel Box Girders for Beijing East Fourth Ring Interchange. Prestress Technology 1999,3(04):10-12. 10.59238/j. pt.1999.04.004