大吨位预锚在石泉水电站坝体加固工程中的应用
作者:
作者单位:

(Wang Taiheng, Gao Zhongpu, Xia Kefeng)

作者简介:

王泰恒

通讯作者:

中图分类号:

TV698.23

基金项目:


Application of Large Tonnage Pre Anchorage in the Dam Reinforcement Project of Shiquan Hydropower Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    大吨位预应力锚固以其价格合理、加固效果显著、见效快而得到广泛重视。石泉水电站经过经济技术比较选用预应力锚固方案加固坝体,通过优化设计,认真施工,30束6~8MN 级锚索的应用获得成功。取得显著经济、社会效益,并为扩大预应力锚固技术的应用和发展提供了有利条件

    Abstract:

    The large tonnage prestressing anchorage has been widely valued for its reasonable price, remarkable reinforcement effect and quick effect. After economic and technical comparison, Shiquan Hydropower Station chose prestressing anchorage solution to strengthen the dam body, through optimized design and careful construction, 30 bundles of 6-8MN grade anchors were successfully applied. Achieved significant economic and social benefits, and to expand the application and development of prestressed anchorage technology provides favorable conditions.

    参考文献
    相似文献
    引证文献
引用本文

Wang Taiheng, Gao Zhongpu, Xia Kefeng Application of Large Tonnage Pre Anchorage in the Dam Reinforcement Project of Shiquan Hydropower Station. Prestress Technology 1999,3(03):38-39. 10.59238/j. pt.1999.03.011

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-11
  • 出版日期: