Construction of prestressed anchor cables for foundation reinforcement of dam sections 1-5 # on the left bank of the Three Gorges powerhouse
Author:
Affiliation:

(Deputy Chief Engineer of 378 Joint Venture Company; Water and Electricity Third Bureau Basic Treatment Company)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    三峡左岸厂房1~6#坝段轴线长229.8m,基础开挖后形成近70m 的高边坡。由于断裂组合形成倾向下游的不利滑动面。加固处理主要采用3000KN 级预应力锚索,共218束,长30~55m。钻孔孔径165,总进尺8445.6m。锚索施工与钢管槽开挖交叉进行。施工后经监测,锚索实际伸长率与理论值吻合较好,锁定锚固损失在1%~3%,满足设计要求

    Abstract:

    The axial length of the 1-6# dam section of the Three Gorges left bank plant is 229.8m, and a high slope of nearly 70m was formed after the foundation excavation. Due to the combination of fractures, the sliding surface is unfavorable and tends to be downstream. Reinforcement treatment mainly adopts 3000KN grade prestressing anchor cable, total 218 bundles, length 30-55m, drilling hole diameter 165, total footage 8445.6m. Anchor cable construction and steel pipe trench excavation are carried out cross. After construction monitoring, the actual elongation of the anchor cable matches well with the theoretical value, and the loss of locking anchorage is 1%~3%, which meets the design requirements.

    参考文献
    相似文献
    引证文献
引用本文

Ren Zongshe, Deng Debin Construction of prestressed anchor cables for foundation reinforcement of dam sections 1-5 # on the left bank of the Three Gorges powerhouse. Prestress Technology 1999,3(01):24-27. 10.59238/j. pt.1999.01.006

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-11
  • 出版日期: