(柳州欧维姆建筑机械有限公司)
刘显晖
(Liuzhou Overwem construction machinery Co., LTD)
Xianhui Liu In-situ test of annular post-tensioned prestressed concrete lining of diversion tunnel of Tianshengqiao power Station. Prestress Technology 1998,2(06):12-13. 10.59238/j. pt.1998.06.003
复制