北京西客站预应力钢结构整体提升安装方法
作者:
作者单位:

(柳州欧维姆建筑机械有限公司)

作者简介:

韩学广

通讯作者:

中图分类号:

基金项目:


Method of integral lifting installation of prestressed steel structure in Beijing West Railway Station
Author:
Affiliation:

(Liuzhou Overwem construction machinery Co., LTD)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    北京西客站主站房钢门楼预应力钢结构,自重 1800t,加承载共 6000t,钢架的上弦和下弦分别设置有预应力束,分两次进行张拉。钢门楼的提升安装采用液压整体提升装置一次提升就位。

    Abstract:

    The prestressed steel structure of the steel gate building of the main station of Beijing West Railway Station has a self-weight of 1800t and a total load of 6000t. The upper and lower strings of the steel frame are respectively provided with prestressed bundles, which are divided into two tensioned. The lifting installation of the steel door building adopts a hydraulic integral lifting device.

    参考文献
    相似文献
    引证文献
引用本文

Xueguang Han, Liaogan Long Method of integral lifting installation of prestressed steel structure in Beijing West Railway Station. Prestress Technology 1998,2(04):18-21. 10.59238/j. pt.1998.04.004

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: