地下厂房顶拱预应力锚索监测成果分析
作者:
作者单位:

(小浪底工程咨询有限公司)

作者简介:

侯新华

通讯作者:

中图分类号:

基金项目:


Analysis of monitoring results of prestressed anchor cable in the top arch of underground powerhouse
Author:
Affiliation:

(Xiaolangdi Engineering Consulting Co. LTD)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    本文对小浪底工程地下主厂房顶拱安装的锚索测力计在开挖期间监测的资料进行了初步分析,就后张锚索张力的孔道摩擦损失进行了初步计算。两者分析的吻合说明,这一阶段的监测资料所反映的锚索张力增加并不是表明厂房顶拱岩体因开挖而发生了下沉变形,而是锚索锁定后自身应力调整的结果,但这期间厂房的开挖爆破对锚索张力变化有瞬时影响。

    Abstract:

    In this paper, the data monitored by the cable dynamometer installed on the top arch of the underground main building of Xiaolangdi Project during excavation are analyzed, and the frictional loss of the hole in the post-tensioned cable tension is calculated. The analysis of the two shows that the increase of anchor cable tension reflected in the monitoring data at this stage does not indicate that the rock mass of the roof arch of the powerhouse has subsidence deformation due to excavation, but is the result of the adjustment of the stress of the anchor cable after locking, but the excavation blasting of the powerhouse during this period has a transient effect on the change of anchor cable tension.

    参考文献
    相似文献
    引证文献
引用本文

Xinhua Hou, Shihou Yu Analysis of monitoring results of prestressed anchor cable in the top arch of underground powerhouse. Prestress Technology 1997,1(02):23-27. 10.59238/j. pt.1997.02.002

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-08-09
  • 出版日期: